To schedule your appointment with us
Galia

Your Perfect Sauna

The sauna you have been waiting for either as a seamless addition to your other MyCabin products or on its own. Relax in your own private spa delivered right to your property.

The price includes:

  • Preparation of architectural plans for permitting

  • Fully outfitted unit completely built and finished in our US factory ready to be installed in less than a day

Customizations to the Galia: color of exterior panels, the choice and color of interior materials, and more. Contact us for more details.

 

Initial deposit for Galia

$2,500

If duplicating a unit, deposit on second unit is 50% of the first
Any changes after preliminary plans is charged at $120 an hour

 

Unit price
$37,500

EXTERIOR FINISH 

  • Spruce, finely sawed, 0.82 x 4.72in, top coat paint, grey tone (anthracite, RAL 7016)
  • Housewrap
  • Wall and roof insulation — rock wool (3.93 in)

INTERIOR FITTINGS 

  • Finishing board, Black alder, 0.59 x 3.34 in
  • Lava board, Black alder, 1.10 x 3.54 in
  • Vapor barrier film
  • Follicle film
  • Waterproofing

FLOOR 

  • Insulation – stone wool (5.90 in)
  • Ceramic floor tiles (7.87 x 7.87 in)
  • Floor ladder H&L (4.84 x 4.84 in)
*subject to change, materials currently being adjusted to US specifications
OUR PROCESS

Simplifying your journey to home ownership

1.
Choose your cabins

Determine if you want the full set or maybe just the Milla or Kalmus.

2.
Ensure you’re ready

Purchase your property or outline the space on your current property for the unit(s) and choose a general contractor for your site work. We will work with you and your GC to align on project details and prep.

*Reference to the section “does your site qualify”

3.
Sales agreement and deposit

You’ll receive the final design with a summary of the specifications, the estimated price with tax and shipping, and the full sales agreement for signing. Sign the sales agreement and pay a $4,000 (50% refundable) deposit to receive your site specific plans for permitting.

4.
Apply for legal permits

If your municipality requires them, this is the time to get those permits in order. We will assist by providing all needed design documents and consult with you and your local contractor.

5.
We start building your cabins

Once permits and 50% down payment is received, construction begins of your MyCabin unit in our factory 

6.
Groundwork and foundation

Once your permits are in order, the foundation and site prep work can begin with your contractor.

7.
Delivery and set-up

Your cabin is delivered on a truck and placed on the prepared foundation by crane, all in one day. Installation is handled by your contractor on your land.

8.
Enjoy your new place!

Your new cabin is move-in ready. It’s really that fast and easy!

To schedule your appointment with us